Weather remains good and World Cup has started. Plum Tree studio is finished - this is a therapy studio working building for a remedial massage therapist. The specification includes - entry porch with wheelchair access - disabled spec toilet, main room , treatment room separated by folding screen and two mezannine floors with ladder access. Floor area is 30 square metres. We have made a couple of videos including an explanation of the sewer system which pumps down a small bore pipe saving cost. see at http://www.youtube.com/ricardospizzeria
We are fitting a belfast sink unit in here tomorrow and then off to build a small garden Gymnasium in North Wales.
No comments:
Post a Comment