Saturday 7 September 2013

Granny Annexe Planning Permission - A true story (painful but with an interesting and happy ending) It can be done!


My amazing 3 hour visit to a London Planning Office (5th September to secure planning permission for a Granny Annexe – by Richard Grace (updated 26th October and more to come - decision must be given on 31st)


(Not named but may do when application is granted) You can see here how simple this development is!

I often handle planning applications for clients. In particular when the building needs it – mostly in the case of accommodation buildings and Granny Annexes. The process helped by our excellent government-planning portal is relatively simple.

Scale drawings including elevations and notes about material etc. need to be backed up with written descriptions of purpose, access statements etc. etc.

Scale location plans have to be purchased annotated and included. To get through the loop with the relevant local planning office the required fee needs to be paid in advance.

THEN

The local planning office takes over and vets the proposal before confirming the start of a timed process leading to pass or fail. Quite simple wouldn’t you think.

At each stage you are kept informed and it is usually possible to speak or exchange email with the person in control for the relevant local authority. I have to say most are very helpful – however:

A recent application was being a bit slow and my client had a bit of a deadline. His mum was selling her house in the hope that she could take up residence in a small well-insulated and equipped new building in her son’s garden. The area had been fenced of and the basic plan is to demolish a tatty old unused garage and replace it. The impact on neighbours is pretty much zero and all the adjoining neighbours were contacted and unanimously gave their support.

I submitted the planning application in mid July, made sure all the boxes were ticked and that the payment (by card) had gone through. After two weeks I received a letter at home delivered by the postman (when the whole process is electronic why am I receiving communication via “snail mail???)

On telephoning to check on what additional documents etc. were required I was put in a queue – no not an ordinary queue but a queue consisting of two days after which I received a call.

Imagine the situation I am on a roof here in Chester supervising two new guys sawing and nailing when the call came in. OK got the jest of this - a drawing showing the position of the new building relative to the existing property and highway (already sent) needed to be to exact scale before the application could be processed. That evening I did it and updated the document set on-line + sent an email to the officer in charge of vetting applications and informed my client of slight delay.

Guess what this process continued every 6-10 days until September. My client’s mother has sold her house and wants to become self-sufficient in her new annexe before Christmas.

So time to cut the crap and go visit the planning office – tooled up (pens, pencils, ruler, computer etc. etc) and prepared to stay until resolved.

My visit


I drove 240 miles and stayed o-night to ensure arrival at my appointment for 10.00 am. The first problem I faced that whilst adequate parking was available for staff customers had to find a parking spot. (Not easy - however achieved within 30 mins).

On arrival with all my gear I noticed an empty reception desk and a long queue – eventually a security guard operating an antiquated computer with one finger dealt with me demanding information they already had “it had already started to remind me of Dads Army”. Thinking, “you already have this and I have just driven 240 miles for an arranged appointment etc. I calmly complied”. There was no invite to a private office and the meeting was clearly to take place discussing my clients private business in a public area.

It soon became clear that I was being treated as a nuisance not a paying customer. I asked for clear instructions about what I must do and just wrote them down as told. During the lecture I was told to consider altering the access statement at the same time. Using copies of the documents I had I updated them in line with the instructions given and with the appropriate coloured pen. Having nearly finished after 5 minutes it was clear that the person meeting me wanted me to leave and do this somewhere else and post in the documents – at this point the meeting became somewhat tetchy.

Not to be put off and thinking about my client I changed tactic and decided to create updated documents on my laptop and continue the meeting when submitted by email.

No connection available and no wifi password given I resorted to my ancient orange dongle and stood outside emailing my advisor who I could see through the window chatting to colleagues in the office.

Having checked successful send operation I returned to the queue, the security guard returned and started tapping at the computer asking me all the same questions again.

I explained that I would like to receive a return email that all was ok and that I would like to leave as soon as I know that the proposal would be released to a case officer.

During my wait other members of the public with queries like my own and some with first visit genuine concern and queries were treated to the same stonewalling incompetent process.

After 15 minutes my advisor (stonewaller) returned with a triangular scale rule (you know the type people used in the war) and a printout of my new location diagram. She pointed out that my scaleable pdf file was not working with her ruler and that some of the notation was a bit small for her to read. I offered my 4.0 magnifications reading glasses and showed a slight bit of frustration. It was clear that there was not going to be a solution unless I did something else.

Taking a step back and muttering under my breath “this place is like a condom on the prick of progress” I re-started my computer and enlarged the writing, scaled the submission and went outside, emailed her, stood back in the queue and went through the process again.

After 2.5 hours it was clear I had eventually worn her down – the gatekeeper was obliged to show me the gate opening. She made one last try to get me back in the queue but eventually realising that I had also brought my sleeping bag, gave in and agreed all was correct.

4 hours later on the way back home I received the confirmation email (no doubt it was knocking off time for her) and was able to confirm to my client that eventually the proposal was being allocated to a case officer. The clock starts to tick now and the planning office is mandated to give an answer within 10 weeks.

I can only conclude that this planning office does not like the idea of people wanting to look after their elderly parents in accommodation ancillary to their own home for some reason I cannot understand. I have kept all the documents for posterity and will now take this matter up with my own MP and the MP for the constituency in this story.

Bureaucracy gone mad a condom on the prick of progress a public service disaster and simply a waste of taxpayers money.

End of rant

Feel free to comment – I swear this is true exactly as I saw it and experienced it!

You don't need planning for this - the amazing warm roof meets permitted development rules.


Richard

Update on Friday 25th October

The application was originally submitted on the 4th of June and validated on the day of my visit noted as 5th of September. We are approaching 8 weeks and that is the normal time allowed.
I checked the online page and can see everything but the decision date which to give normal service should be early next week. There is no decision date listed so I phone the council.
Usual service resumed "you will have to wait 2 days for a call back etc etc. etc. etc. Demands for more and more info etc. etc. I keep trying over and over and eventually the music is applied to the phone - I wait 5 minutes listening in frustration to Vivaldis Four Seasons - Great music but I am busy and would rather hear "living on a prayer" by bonjovi!
Eureka - a polite guy comes on the phone and says - Richard the decision is due on the 31st October.
Watch this space will my clients mum get in for Christmas?

 

Update on Friday 25th October at 19.11

I received an email at 4.24 pm today as follows: (names and authority references removed because I am not sure that leaving them in is legal + the battle is not over)


Dear Mr Grace,
I write in relation to the above application.
As submitted the application would not be considered acceptable as the proposal would be considered a separate planning unit and would not be considered to be ancillary to the main dwelling.
The structure is located in an area which has been self contained from the main dwelling by a fence with 2 accesses to the rear garden of the main dwelling and a separate access onto xxxx. The structure also contains three elements that together would meet the tests of whether this can be deemed to be a self contained residential unit, namely a kitchen, living / sleeping space and shower/wash room.
Therefore as submitted the proposal is considered to be creating a self contained residential unit for which a separate full planning application would be required and this cannot be pursued within this current application as it materially changes the nature of the submission. A new application would be assessed against the criteria for a new residential dwelling such as habitable space, amenity space and parking.
I note it is not the intention to create a new residential dwelling, and suggest that were the structure to be located a minimum of 2 metres from all boundaries, the structure could be considered permitted development and would not require a separate grant of planning permission. You may wish to submit a Lawful Development Certificate to confirm this, but again the use would still be questionable if the three elements were referred to above, a Lawful Development Certificate may not be issued in these circumstances.
I will therefore recommend the application for refusal unless you advise that the application is to be withdrawn. Should this be the case please email xxxxxxxx quoting the above reference number confirming of you wish to withdraw the current application on or before Wednesday 30 October 2013, as the decision must be made by Thursday 31 October 2013.
I do not consider that the proposal can be amended to be made acceptable as the proposal is considered to create a separate planning unit due to its location and self containment from the main dwelling.
I will be on leave from 28 October until 4 November, however if you have any questions please contact my Area Planning Manager, xxxxxxx at xxxxx alternatively he can be contacted through our contact centre, who will log a request for xxxx to call you back. Our Contact Centre is open from 9am to 5pm and the telephone number is xxxxxxx
Please note the advice in this email constitutes informal officer advice only and is offered without prejudice to the formal decision of the Council on any current or future application(s) you intend to make.
Yours sincerely,
xxxxxxx
Planning Officer
xxxxxxxx
Development Control Department
At 19.01 today I advised my client to give me authority to withdraw the application (we are not finished yet)
I am fuming - my access statement available publicly until the 28th and available from me on pdf right now - said clearly this was an annex to the main property and more importantly the words "There is no intention of renting this new structure commercially or splitting the plot for separate sale" were written in my own handwriting and signed by me after taking advice on my visit.
What is going off - this is a perfectly suitable proposal agreed by neighbours for a family with great family values being blocked by a dictatorial planning authority for no reason. Who leave it right to the last minute and then the case officer abdicates by email two minutes before taking leave.
Watch this space - the story is not over.

Here is the access statement (one of the most important bits)

 It simply could not be clearer that there is no intention of developing a "separate self contained residential unit" unless anyone else knows how to make this clearer the planning authority are simply wrong!

As a result my clients mum will not be spending Christmas with her family. How sad!

Update on Saturday 26th October at 11.53am
After sleeping on this I have decided to make one more try to appeal to the better nature of this planning department: (text of my email sent here)

FOR URGENT ATTENTION OF ***** (The planning director) (autoresponder has confirmed receipt)
****
I do not fully understand the reason for **** recommendation.
This is a genuine case of a close family wanting to look after their elderly relative close by whilst allowing her independence of living to last as long as possible.
The building is not an independent unit it is ancillary to the main property and I understand that revised council tax will be due if assessed.
The current news is that families are being encouraged by our government in particular I have followed the guidelines being issued by Eric Pickles Communities secretary. Even this morning there was a related debate on Radio 5 Live about the move towards helping families in the case of elderly relatives needing care.
As advised at my visit to your office I made it clearer on the access statement  that the building "in no way was intended for commercial rent or splitting the plot for separate sale". To me this means "this is not an attempt to create an independent living unit"  These were the words advised by your department and fully understood by myself and my client.
Before making the application my client had under my direction significant consultation with the neighbours who were all genuinely supportive. At these private consultations all were shown my plans and drawings for the project. There were no objections.
I truly believe that this is a development which should be allowed in the spirit of encouraging families to look after their elders. It seems understandable and sensible that **** mum should be allowed to stay with her son with some independence but in close proximity where she can receive first hand help and support from her own family.
I believe that you can add conditions to a granting of permission and as I have clearly explained its purpose I ask that you should re-consider the recommendation and allow this family to do what is best for them as a close unit.
You can contact me by email at this address or call me on 01244 679502 any time. (my mobile number is also listed below) I have found it somewhat difficult to communicate with your department although I can understand that you are all busy the 2 day phone back appointment system is sometimes a bit difficult. Now it seems unfortunate that **** is on leave and I cannot communicate with her direct.
From my own point of view I too am busy in my small building business
I specialise in design and build of bespoke Garden Structures and many of our projects are of a similar nature. I always advise clients that if a building which is essentially ancillary to the main property will be used for people to stay (mostly elderly relatives and youngsters returning from uni etc.) it should be cleared with the local authority planning department by obtaining the appropriate permissions..
Without this clearance there are two issues:
1. the financial risk involved to the family
2. the potential stress to the family should there be any authority or neighbour issue about development which is used for people staying.
Most of my applications of this type are approved. In this case I see nothing unusual about the plot and certainly there are no neighbour issues in fact the neighbours are genuinely supportive.
Please take one more look at this application and let me know in a way which is more understandable to myself and the family involved.
I am sure that if your reasoning is understood it would be better to withdraw the application rather than risk a rejection added to the property register. But right now I am asking you to reconsider and recommend approval on the basis that this is the correct and most human thing to do.

Richard

Monday 28th update 7.33pm


No reply! No call! (today)!

Thursday 7th November

Must be nearly done:

Received this and sent reply:

Dear Mr Grace
Thank you for your email. As you know, **** is on leave this week but spoke to me about this application last week.
I have to concur with the way that **** has approached the consideration of this application, and note from experience of other applications to create ‘similar’ accommodation that they have generally been proposed in extensions that are physically and functionally attached to the main house.  
Looking at your current proposal, it seems to the Council that the development will be capable of complete self-containment including all the requisite elements for a dwelling house yet not meeting the Council’s normal housing standards, with the site physically separated from the remaining parts of the site curtilage by a fence with a separate independent means of access from the return elevation in ***** ****.
As such, and on the basis of the information in front of the Council at present, it seems that this development would appear as a self-contained unit of accommodation created within a new planning unit. Whilst I understand your point concerning conditions, it is our view that such conditions would not overcome the concern regarding harm in this particular case.
I look forward to receiving your response and confirmation that the application will be withdrawn.
Yours sincerely
****
My Reply Nov 4th (still no reply to this)

***
Re ****
Thanks for your email. The separate access to the road is not required and neither is the fence. So I guess it all hinges on the issue as to whether this a development of a new self contained unit of accommodation. The answer from us is that it is not.
The purpose of the development is ancillary to the main property and is not intended to become a separate dwelling unit. It is a Garden Building of high quality where **** mum will be able to stay and be looked after by her family. An Annexe to the main property not a separate dwelling unit.
I guess this has become a battle of words i.e. what is it that we want to develop. What is it called and what facilities does it have. I guess we could take out the plumbing and put in a hosepipe and a bucket if that helps. Also we could take out the worktop / kitchenette and a kettle on a table would do the job.
We are happy for you to attach conditions making it very clear that this building is for purposes ancillary to the main property or whichever way you wish to word this.
I really cannot understand why this proposal is being recommended to be declined. Is this something that is not allowed as a policy in **** because there are such annexes all over the country?
Richard
Note:
I have printed all 96 pages of the appeal process document for study.
Do I have tenacity or what!
Watch this space

Update Nov 16th (my email has not had the courtesy of a reply) - Try again!

****
I have not had a reply to my previous email dated Nov 4th
Is **** back from vacation and does she have my email?
I note there is no date for decision set yet and I am still expecting that this application will receive approval.
Richard

I have had time to read all 1997 pages of the appeal process guidance and think that appeal is the route to go if this application gets turned down. There is little possibility of my clients mum getting settled in before Christmas now - but you never know!
Watch this space

22/11/2013

Received this:

Dear Mr Grace,
I can advise you that at present we are reviewing the above application in respect of the relevant case law and other material considerations. I will update you further as soon as I have additional information.  
Yours sincerely,
**** *****
Planning Officer
London Borough of *****
Development Control Department
Looks promising - I replied immediately with thanks and sending again all my contact numbers + pointing out I am working close by at this time etc.
Case law things I don't understand sounds like lawyer stuff (a bit parasitic) what I am interested in is that Gary's mum can live close to her son and family where she can get best care and quality of life!
Here's hoping for a happy ending - Richard

11/12/2013 - update

Nothing yet but it would make a happy ending - I just sent this:

******
Could we please have an update before Christmas on 184 Church Hill Road. It would be great if Gary's mum could get a positive answer.
Do you need anything else from me?
Richard
(It's difficult to believe but all true) The planning authority are well outside their timescales and my client is being disrupted in basic life planning..
I am simply behaving like a "dog with a bone" !

7/01/2014

My message to the client - a bit late but a very happy ending!

YES - I am very sorry for the length of time it took but I have taken this as a sort of personal battle - I do possess tenacity, usually I know who the winner is going to be but in this case I admit to periods of doubt. This morning after 32 minutes on the telephone to **** council 10 of them waiting in a disorganised que I completely and utterly lost my rag. I said something like "if you play me any more f'ing Vivaldi I am not sure what will happen next". The operator read from a script saying "I am sorry Mr Grace but I have my supervisor and my manager listening to this call and I am required to terminate it"
She did and this afternoon I received the approval email. (including not 1 but 2 apologies).
I have accepted and the planning is now granted. (subject to the conditions below)

The fence line between the main house and the detached garage would need to be removed.
Conditions would be imposed to ensure that the proposed detached building remains ancillary to the main dwelling and at no time becomes a separate self contained residential unit.
What a result!
So the answer is yes the project can go ahead.
This mega blog post has ended - next post 2014 trends already part prepared and planning issues will never be the same (you can win with tenacity)

Oh! update a bit late but here is a photo done!

 
Richard



Monday 29 April 2013

Soundproof Garden Studios and Garden Offices

Garden Office and Garden Studio Soundproofing

and

 

How to build a Soundproof Garden Studio


Written by Richard Grace - Garden Structures Ltd April 2013 with help and advice from Jonathan

 

About Sound


In order to stop the passage of sound it is a good idea to understand a few of the basics. Sound travels in waves and is measured in decibels (the quantity of it)  = (volume).  If you stop these waves travelling they bounce around and find another route – I guess this means it is a bit directional. In an enclosed space sound seeks out every possible way of spreading and finds the most impossibly small weakness in soundproofing to get out.
 
 

Why would we need to soundproof a Garden Room?


There are two reasons only for soundproofing any enclosed area:

a)      To stop the possibility of the sound penetrating outside. If you are audibly communicating and want this to be secret or - more usually stop the possibility of annoying the neighbours.

b)      You want to listen to the purest sound, which could be silence or beethoven without the interference of the outside environment (this applies if you live in a flat with adjacent neighbours up, down or to immediate sides who in enjoying themselves can create a bit of a distraction).

Back to Soundproof Garden Studios.



For sure it is not a good idea to constantly play loud music or watch East Enders at high decibels in an ordinary garden shed. For whatever reason it is easy to understand that sound which is pure magic to yourself is not “everyone’s cup of tea” if you get my drift. Personally I love music from the musicals and motown) but others seem to enjoy electronic techno-rubbish. Everyone has some difference in taste.


A Professional Soundproof Garden Studio


The whole subject of soundproofing takes on a different dimension if you deal with sound as a professional. You will no doubt want to mess about with it and listen to the same thing over and over again to make sure it is correct. Although I have little expertise in the sound engineering field I have understood that the various frequencies of sound (base / treble / drums / pianos / guitars / vocals (also in different pitches) etc. can be split up and mixed to create better and better versions of the stuff. Digital manipulation of sound is now available even to the amateur enthusiast using special software and an ordinary computer. Pro Tools, Logic Pro and Garage Band from Apple are good examples of this.

If you are an enthusiastic amateur or indeed a professional the last thing you want to do is let this hobby or work have a detrimental effect on relations with neighbours. Nor would you want to send off a piece of finished work where the sound of the upstairs neighbours trying hard to ensure continuance of the human race is clearly audible.

So to make sure the Soundproof Garden Office works well and avoid unnecessary stress for all around:

How to stop sound - in or out of a Garden Studio 


Well - firstly mass stops sound - mass means weight/volume and has an effect on cost of material. As the most accepted material for Garden Offices and Studios is wood and wood has volume but not terrific mass then there should be some other layers. More layers or more mass often (mostly) means more cost. Now you have the message that increasing soundproofing of a structure also increases cost of building it.

You could of course build a concrete bunker underground but whilst protecting from bombs (and the noise of them) in neighbouring areas this is hardly ever a practical solution. What you need is maintain an acceptable exterior architecture and add layers of mass. So for example ordinary timber cladding with the normal type of heat loss insulation can be protected from sound leakage or ingress with additional layers on the inside.
 
 

A Room within a Room


In a typical "stop the neighbours being annoyed” situation take care and plan well. You are trying to build a “room within a room”. Firstly the room as viewed from the outside should be ok with you and the neighbours and not have on it signs logos and murals, which will make the whole thing far more sensitive than necessary. I have never been surprised that us humans can hear any disruption in silence if we really want to!!!

So a Sound Studio in the garden should a) look like a normal garden building and b) block as much sound passage as possible within budget.

More mass is needed and normal looks are needed. Cost is always an issue and more mass = more cost more mass = more weight more cost = less of the other stuff you need. It is about as simple as that!

Specialist Soundproofing Materials


So let’s turn to experts in providing mass at less cost and less weight to create a room within a good looking traditional garden room within your budget and we are all on the way to success.

How to create a Sound Studio that works

 
  1. Choose a traditional design with acceptable and unobtrusive appearance.
  2. Build its outer skin / doors and windows with normal materials fitting in to the existing environment
  3. Inside the outer skin build another room, which stops the passage of sound. Using the correct layers of mass to suit the decibels being distributed outside, or inside at the target cost.
  4. Consider secondary doors and windows to complete the sound blocking.

This is done usually by de-coupling the outside room from the inside room. Either two structures or more economically mount the inside room on de-coupling mountings (resilient bars). These cost effective / easy to fit components stop the passage of vibration (which is what sound is) and are the most important part of any soundproof Garden Office or Soundproof Garden Studio.

 

Next task is to provide they most cost effective soundproof room. Dense plasterboard in layers sandwiching SBM5 the environmentally friendly equivalent of lead will do the job required in the walls. Windows and doors need further attention, as plasterboard and SBM5 will not fulfil the purpose of easy access and allowing natural light when preferred. It is a good idea therefore to consider secondary (soundproof doors and window shutters)

Taken as a package with the correct layers, the correct materials and the correct installation it is possible to contain loud music in the garden shed and stop ingress of outside noise completely on a reasonable budget.
 

My advice for creating a Soundproof Garden Building


  1. Make it look traditional
  2. Build two rooms one within the other
  3. Use dense materials for the inner room
  4. Provide secondary screening for doors and windows


Stay at peace with your neighbours, reduce stress, and keep sound waves, decibels / "your own taste" in music or TV to yourself.

Soundproof music Studios for your Garden written by Richard Grace with help and advice from Jonathan

 
April 2013 for more info visit  www.aarco.co.uk
 

Wednesday 20 February 2013

Garden Office and Studio Foundations


Garden Office / Garden Studio foundations and base systems - your options explained


Oh no! This has got to be the most boring subject I have blogged about to date. B b but but here goes! (Sorry in advance if you find this a bit of a rant. Here it is and it did take a bit of thinking about!!!!) "Make sure next doors cat doesnt get concrete on his feet it burns"



Tigger from next door
 
THE GOLDEN RULES FOR FOUNDATIONS

  1. There is NO base type suitable for all sites.
  2. If you are using concrete (sometimes best) don’t order it before the shuttering is perfect. By perfect I mean strong, exactly the size of the building footprint, exactly the shape of the building footprint and accessible to the delivery – “you can use barrows or mix and pour but make sure the route to site works”. CONCRETE IS HEAVY! And you don’t get long to work with it.
  3. If you are using a timber frame base make sure NONE of the timber is in contact with soil and don’t forget that this needs to meet the footprint rule too.
  4. If you are using another system ask yourself – WHY? It’s no good asking your supplier because the answer from them in reality is “well that’s what suits us”
Here you can see a good example the building and the frame it stands on.
 

FROM EXPERIENCE AND RESEARCH The abc of Garden building foundations.

Having installed quite a few bases and made quite a few mistakes and read quite a lot of “bullsh**” about this subject before “putting fingers to keyboard” here are the important issues a b c and d only that is all there is.

a)      The purpose of the base is to transmit the load of the building to the ground. It must never move, sink, rot or break in any way during the whole life of the structure.

b)      It will (or should) NEVER be seen.

c)      It should cost no more than necessary to fulfil its purpose.

d)      It should not be disruptive in any way, which is unnecessary, e.g. create waste, damage surroundings or cause risk. It should not involve too much physical work (unless of course you want or “need” it).

e)      It should NOT cause an issue with planning or permitted development when considering the finished height of the structure. (Don’t jack up a 2.5m building over height using decking or a pad/jack base systems and expect to get away with it).
 
See how good this looks on a well designed base

THE COST £££ (you will never see)

The cost can be calculated this equation >>> Cost of base foundation =  (Access difficulty / the lie /slope/drainage/tree population of the land  * Chosen design + hired labour and tea bags etc.).

 

i.e. a sloping site accessed through the house using concrete with bad shuttering inexperienced labour and poor preparation will cost £A PACKET. A flat site with subsoil already removed accessible to the Shute of a concrete lorry will cost £NOT MUCH. A timber frame base correctly installed will cost £NOT MUCH either unless it jacks up the building over the planning permission limit.

CONCLUSION
 
Every Garden Office and Garden Studio site is different. This is a fact.

 

After 1000+ site visits and reading 300 + web comments, stories, case studies, DIY blogs etc. I have come to this conclusion.

 

Don’t re-invent the wheel – it is simple “No site is the same and no method fits all”

You need a base that does not rot, does not move, transmits the weight of the building to the ground, does not cost the earth and does not damage our planet.

 

I doing a bit of re-stating the obvious because I have seen it done wrong look at this!!!
 
What a mess I found on arrival - wrong size - not level - not square - not flat - not good!

 

  • Buildings need a functional foundation (The Shard is not standing on a screwpad DIY base)
  • The “next door neighbours son who needs a bit of work” might not know how to design and construct suitable foundations or clear up the mess!
  • Your chosen supplier for a new Garden Building will NOT be able to recommend the correct system if he or she has not seen the site.
A Quick summary

Design the base and select your chosen option taking into account the above.

 

To build a concrete base – Dig out the turf and topsoil, put in road stone, MOT, crusher run or whatever it is called in your area and level this. Vibrate to solid with a whacker plate. (If there is any doubt insert steel mesh when concrete is poured). Fix strong shuttering square and level measure everything twice and then lay a damp proof membrane. Pour the concrete and level to shuttering as you go. The wetter the concrete the easier it is to lay (excess water weakens the concrete but makes it easier to get a flat level surface).

 

To build a timber base use treated joists. Insert pads to carry the timbers at spacing which will not allow joists to bend. Fix the joists together. If the ground is sloping use concrete pillars or wooden pillars on concrete pads to ensure frame is level. Make sure there is no timber in contact with the ground and that air circulation is present.

END OF rant! …

 

Garden Office and Garden Studio Foundations. Written by Richard Grace Garden Structures Ltd Feb 2013   www.aarco.co.uk

Tuesday 8 January 2013

Garden Office and Garden Studio Trends 2013

Review of the Garden Office, Garden Studio, Garden Room and Garden Pod market including predictions for 2013.


Very interesting indeed!

Via “Google Alerts” I received this morning a link to http://www.garden-office-expert.com and read a post that sounds very interesting and a bit risky at the same time.

Charlie Dalton is a friend, a competitor and a very experienced Garden Office Builder. I could even say with some confidence one of the first and the best in our market. (So am I by the way). This new posting announces the imminent arrival of a “top 40 review of Garden Office suppliers”. ("The definitive Top 40 List of Garden Office suppliers in the UK" with financial data?) We will soon see it!

What use will this be to potential Garden Office clients? It will no doubt tell us that Extrarooms has become Extraroomz and the last published figures for Dunster House but it can’t tell us why or what is happening now. It may tell us that Decorated Shed has disappeared from our market with their fabulous buildings and super marketing but not why?  I hope it tells us iobuild are doing well as for me their website is industry leading in content and design. Their products and image are top-end and we all need that - if we have the money!

By the way in 2011 Aarco changed name Garden Structures because the name needed to be more user friendly. Nothing here at the office changed at all for clients or suppliers.

 

Grand Designs 4.5m high oak doors on super cedar garden room built by us in 2012 (colorcote urban roof at 12 degrees double tilt)


If I were a housing property developer and wanted to include a Garden Office in 20 of my new properties this year I would definitely bookmark Charlies post and come back to read it when published. It would be a small part of my strategy but I would want the comfort of knowing someone had done my research for me.

It is of course clear that Charlie knows this market, and has a great deal of hands on experience in running an expanding Garden Office / Garden Studio company. Smart Garden Offices

The Garden Office and Garden Studio market is “like”  (perhaps 2013 will be the year of “like” why is there not a “dislike button” on facebook?


The Garden Office Market today Jan 2013


This remains a diverse market populated by small, medium and large players. The market is in constant flux (new entrants and existing companies diversifying their building offerings). Many are one-man bands. Web sites do not give data like balance sheets, profit and loss statements. Publicly available accounting information here is historic to the point of being useless.

 


Traditional Garden Office and Store design and build by us 2012


 

About our company Garden Structures Ltd.


 

The typical client of our business looks for a supplier by battling their way through a minefield of websites, most saying they are the best, why this is and backing it up with photos and case studies. In the case of the larger (not necessarily) long established companies it is pretty obvious how they are doing because things move much slower. What I mean here is that in my 10 years in this business I have never seen a totally flat garden building site next to the drop-off point with services in place and the kettle on!

The web does not give all the info BUT it is the only research tool available to the client on their search for best supplier.

There is no average client but all have specific goals in relation to achievement of the extra space they need. All sites are different and all people are different.

See here what a site looks like on my visit and what is intended as a replacement: I love the drawing but "the cat is not to scale"

 
 
 

Other Market information and lists of suppliers

 
We have in our space only two websites, which review the market constantly:

  1. The Garden Room Guide
  2. Shedworking
As we all know now The Garden Room Guide is a directory (a very good one) with user generated content, comments and specification info. A massive amount of supplier generated content - including text, photo and video. Advertising funds it! Shedworking is a long established blog started and run by a journalist (unbiased we hope but a true professional in my opinion) and offering advertising on the side.

The Garden Office and Garden Studio Business 2013

 
Building Garden Offices is an attractive business but not always for those with the primary goal of wealth generation. The lifestyle is attractive – relatively short projects, real man stuff (working with tools). Outdoor physical activity and  a certain amount of interesting travel. It is never boring for long as projects are relatively short but very rewarding.

If you are reading this as a potential client then I urge you to read it again and if you are reading this as a competitor thanks for visiting.

If you are a potential client then what you should do is:

  1. Research for your potential suppliers and narrow them down to a shortlist
  2. Get firm quotations
  3. Talk to the suppliers
  4. Get references
  5. Check out if you need planning permission
  6. Check out if you need to comply with building regulations
  7. Follow your best instincts
Cheapest is not always best neither is the most expensive. Your priorities may be saving your own time, saving your hard earned cash or both it is that simple. There are many differing specifications and most have their place.

There is a seasonality issue in the Garden Office Business as days get shorter and weather deteriorates from October activity and productivity reduces. Driven by new -year resolutions, improvement in light and weather the business wakes up in January and gets a head of steam in March.

My Garden Office and Garden Studio market predictions for this year 2013 are:


  1. Continued growth driven by our economic situation as a nation
  2. Massive growth in Granny annexes and small accommodation buildings driven by the same + the escalating cost of care
  3. Development of new techniques will slow as we have enough insulation and cladding options already
  4. Diversification into other garden structures by established Garden Office companies as synergy exists
  5. Maybe a few more players will fail as competition will remain fierce
  6. In addition to self-build and full service offerings the client supplier relationship will develop to use more local labour for base installation, landscaping, electrics and plumbing. Driven by escalating cost of travel, and a fear of the effect of weather on productivity.
  7. Google will change their algorithm at least 3 times reshuffling the top 40. This generates more work for SEO companies and of course more revenue for their adwords goldmine.
  8. More and more “Garden Studio Pods” with different designs and maybe different materials as cedar reduces in popularity as a standard cladding for Garden Buildings
  9. Broadband range extenders in Garden Offices will become a popular extra we have been fitting them for some time and they work well
  10. Toilets and plumbing are becoming a "possible may have"

 

More like this I guess

 
Let,s all hope the weather is better in 2013 and that the competition in our market benefits suppliers and clients alike.

Thanks Charlie for helping me spice up my post and good luck with the "imminent" publication I await it with interest and I guess so will industry watchers and most importantly our mutual potential clients.

This post has been revolving in my head for some days now and your post has helped me “spice" it up. I look forward to reading the top 40 review, being in it and getting a good word!


written by Richard Grace Project Director Garden Structures Ltd www.garden-office-studio.co.uk link to us with anchor text “Garden Offices and Garden Studios” se us on twitter / facebook / pinterest / Houz etc. etc. etc. Comments welcome!

We have just taken an order for this for central London so must get on with real work:!

 
Will publish in-situ photo when done! No it's not on a beach!

About Me

My photo
Richard is an experienced business consultant specialising in garden structures design and planning + The UK's leading expert in using Pinterest for business marketing web traffic generation at lowest cost.