Bothay is ready for final fit out

Weather prediction for tomorrow is "heatwave"

Just returned from site having prepared "Bothay" whatever that means! ready for second fix electrical and installation of kitchen etc. Here is the view from is surrounding garden:


Dylan is sweeping up whilst I take photos.

This building designed for the site is 10.5 m * 4.0m and has a covered area - you can see to the left. On the subject of weather, yesterday Dylan an I were sitting "grabbing a sandwich just to the left of this photo and a tornado the first one I have experienced at first hand passed diagonaly as you look at the photo - over the covered area.

Inside:



Inside you can see the complex roof or at least a bit of it as the building opens out giving a massive 30 sq metres of internal space.

Just a shot of the covere area:

A good space for sitting outside in the rain - a bit more space to fumble with keys when carrying ple of papers and a laptop!!


Next week we move a previous building and start work on a huge veranda - bit busy but will keep blogging.

1 comment:

  1. Hello,

    Nice article has been shared here. It was fun reading your this article and also did get lots of good points from here. i would like to visit here again in future too. it would be great if you can share some information related to Office fitout here in this article. keep on posting such article here in future too.